Almas Thirr

2017 12 03 Meeting Summary

Proposed Agenda

  • Almas-Thirr fact finding (two missing interiors were already found and the sewers are connected to the wrong interior).
  • Find out which, if any additional interiors are missing from the Indoril-Thirr or Old Ebonheart section files.
  • What does Indoril-Thirr need to be merged as minimum viable product (MVP) for the March release?
  • What does Old Ebonheart need done to be considered a MVP for the March release?
  • To build upon the MVP (Minimum Viable Product) discussion, which questlines should be finished or integrated in OE and Alm

2015 02 07 Meeting Summary

This is a summary of the Skype meeting that took place on Saturday, February 7, 2015 based on my notes. The meeting was very short, as there wasn't much to talk about. The next meeting will probably be on the topic of Imperial guilds, and will probably take place on Saturday, February 21, 2015 at 6:00 PM GMT/UTC.

Pages

Subscribe to RSS - Almas Thirr